Shandong Hengshun New Materials Co., Ltd. 60,000 tons/year high-performance insoluble sulfur project environmental impact assessment for the first time publicity


release time:

2019-06-10

Shandong Hengshun New Materials Co., Ltd.60,000 tons/year high-performance insoluble sulfur project

First in environmental impact assessment Announcement

According to "Environmental Impact Assessment Law of the People's Republic of China", "Environmental Impact Assessment Public The Interim Measures for Participation and the relevant regulations on the environmental impact assessment of construction projects, publicize the construction situation and environmental impact assessment of the project, so as to widely understand the attitude of the public from all walks of life towards the project and the opinions and suggestions on environmental protection, and accept the supervision of the public.

I. Name and summary of construction project

Project name: Shandong Hengshun New Materials Co., Ltd.60,000 tons/ Annual high performance insoluble sulfur project.

Project overview: The total planned investment of this project is 785 million yuan. The construction site is Shanxian Chemical Industrial Park, Heze City, Shandong Province. The project covers a total area of ​​about 280 mu. The main construction contents are production workshops, warehouses and supporting office areas, public auxiliary works, and environmental protection facilities. The construction scale of this project is an annual output of 60,000 tons of insoluble sulfur.

This project has a workforce of 420 people, and the production system is based on four shifts Three-run work system, 8 hours per shift, continuous production, 8,000 hours of work per year.

According to the National Development and Reform Commission's "Industrial Structure Adjustment Guidance Catalog (2011 version)" (2013 revised version), this project does not belong to "encouraged", "restricted" and "eliminated", but is a permitted project, so the construction of this project is in line with the national requirements of industrial policy.

The layout of the project site is basically reasonable and in line with relevant national industrial policies and environmental protection policies , The production technology is advanced, mature and reliable, and the market prospect of the main products is good. After the project is completed, it can promote local economic development and provide labor and employment opportunities for local people, with good economic and social benefits. After the project is completed, under the premise of strictly implementing various environmental protection measures, the generated “three wastes” emissions will have little impact on the surrounding environment. After the completion of the project, it will not only provide employment opportunities for the nearby people, but also promote the development of the local economy, with good economic and social benefits.

II. Name and contact information of construction unit

Constructor: Shandong Hengshun New Materials Co., Ltd.

Land    Address: Heze City, Shandong Province County Chemical Industry Park (zip code: 274300)

Contact Contact: Yao Xianfeng

Electric    Phone: 15054689028

E-mail:yaoxianfeng@sunsine.com span>

III. Name and contact information of environmental impact assessment unit

EIA unit: Shandong Qingke Environmental Technology Co., Ltd.

Land    Address: East Wenhua Road, Jinan City No. 80 (Postal Code: 250014)

Link Contact: Wang Gong

Electric    Phone: 0531-82663185 p>

E-mail: 1131046371@qq.com

IV. Procedures and main contents of environmental assessment

1. Through on-site investigation, understand the environmental conditions and engineering conditions around the project, and carry out Monitor the current situation of the environment, collect relevant data, complete the preparation of the report, and submit it for approval.

2. This evaluation will be based on the design data of the project (feasibility study report ), as the main technical basis for process technology route, site selection, "three wastes" generation and discharge, etc.

3. This EIA will be conducted in accordance with the "Environmental Impact Assessment Law of the People's Republic of China" and other relevant laws Regulations and technical guidelines require that the existing technical data should be fully utilized and combined with the project construction situation, the environmental status assessment and environmental impact prediction and assessment of the project construction area should be carried out. The environmental impact assessment of this project will be based on engineering analysis, focusing on the risk of accidents during operation, environmental air, surface water, economic and technical demonstration of pollution prevention and control measures, and clean production analysis, and at the same time, the public participation opinions will be analyzed. , put forward practical measures and countermeasures to ensure public interests, achieve harmony between project construction and environmental protection, and achieve the unity of the three benefits.

V. Main issues for soliciting public comments

Solicit public opinions and suggestions on the construction of the project.

6. The main ways for the public to make comments

The public can download and fill out the public comment form and submit to the construction of the building by phone and email. unit or evaluation unit reflects.

The web link is as follows:

http:// www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

It is hereby announced that if any unit or individual has valuable comments or suggestions, please pass Contact us as above! This announcement is valid for ten days from its publication.

June 10, 2019 Day

WeChat

手机官网

Shandong Sunsine Chemical Co., Ltd.

Headquarters address: Shanxian Economic and Technological Development Zone, Shandong Province

Postcode: 274300

Office: 0086-0530-4681625


copyright © 2022 China Sunsine Chemical Holdings Ltd.